inputs for comparative analysis of blue hydrogen
- akazani
- Topic Author
- Offline
Less
More
- Posts: 8
- Thank you received: 0
1 month 3 weeks ago #592
by akazani
inputs for comparative analysis of blue hydrogen was created by akazani
Hello,
With the below process, what cells / fields need to be updated to compare the carbon intensity of blue hydrogen from natural gas produced in BC in 2023.
Thanks for your help.
https://lh7-rt.googleusercontent.com/docsz/AD_4nXdkR0mVpQl12iIEvJ_9643F793aBjf6ZqU9dwYdMpxrDSJtlU2ZLAYIriALaIpOzCphJlGaldjGyoFmiaBrWr2H3-jCeJpcfADxub3DSkp4Rwi4IXupdtAIgvAOuMbh-rWK9yhAqA?key=SNnyOvP7dzWMRk_6LH3HZNDu
With the below process, what cells / fields need to be updated to compare the carbon intensity of blue hydrogen from natural gas produced in BC in 2023.
Thanks for your help.
https://lh7-rt.googleusercontent.com/docsz/AD_4nXdkR0mVpQl12iIEvJ_9643F793aBjf6ZqU9dwYdMpxrDSJtlU2ZLAYIriALaIpOzCphJlGaldjGyoFmiaBrWr2H3-jCeJpcfADxub3DSkp4Rwi4IXupdtAIgvAOuMbh-rWK9yhAqA?key=SNnyOvP7dzWMRk_6LH3HZNDu
Please Log in or Create an account to join the conversation.
- akazani
- Topic Author
- Offline
Less
More
- Posts: 8
- Thank you received: 0
1 month 3 weeks ago #593
by akazani
Replied by akazani on topic inputs for comparative analysis of blue hydrogen
Attachments:
Please Log in or Create an account to join the conversation.
- doconnor
- Offline
Less
More
- Posts: 192
- Thank you received: 33
1 month 3 weeks ago #595
by doconnor
Replied by doconnor on topic inputs for comparative analysis of blue hydrogen
This is a relatively simple pathway to model.
Most of the inputs are on the Input sheet.
Set the model to BC and the year to 2023.
For the hydrogen production the natural gas and electricity required for the process are input in column W rows 241 to 248 on the input sheet.
If the process ends at the plant gate set C253 equal to C254. Set the transportation parameters to zero in columns BH and BI in rows 91 to 102.
For the blue part set B69 to 1.0 and then set the CCS parameters in column U, rows 19 to 26 on the sequestration sheet.
The results will be in column DE on the Upstream Emissions HHV sheet.
Regards
Don O'Connor
Most of the inputs are on the Input sheet.
Set the model to BC and the year to 2023.
For the hydrogen production the natural gas and electricity required for the process are input in column W rows 241 to 248 on the input sheet.
If the process ends at the plant gate set C253 equal to C254. Set the transportation parameters to zero in columns BH and BI in rows 91 to 102.
For the blue part set B69 to 1.0 and then set the CCS parameters in column U, rows 19 to 26 on the sequestration sheet.
The results will be in column DE on the Upstream Emissions HHV sheet.
Regards
Don O'Connor